Read the specific request
Start with the actual letter rather than a general list of older panel brands. Note the equipment or condition identified, the response deadline, and the documents the insurer wants. Keep the original notice so everyone is working from the same requirements. If the wording is unclear, ask your agent to explain it in writing.
Prepare for the estimate
Share your city, the notice, and a description of the panel location. Photographs of the surrounding area and labels that are safely visible can help start the conversation. Do not remove the protective cover or touch wiring for a photo. Before sharing documents, redact policy numbers and unrelated personal information.
Separate replacement from added capacity
Tell us whether the goal is simply to replace the existing panel or also to support new equipment. A replacement at the same amperage and an increase in service capacity are different scopes. Adding an EV charger or another large electrical load should be discussed before the estimate, not after installation is scheduled.
Confirm responsibilities and timing
Ask what the written estimate includes: equipment, permits, PG&E coordination, inspections, fees, and any related site work. Let us know the insurance deadline early. If more time is needed, request an extension directly from the insurer; scheduling the work does not itself extend that deadline.
Keep the completion records
Ask the insurer which records it will accept, and retain the invoice and applicable permit and inspection documents. Replacement does not guarantee renewal or reimbursement. The insurer decides whether its requirements have been met; ask your agent about coverage separately from the electrical estimate.
Further reading: California Department of Insurance: residential insurance guide (opens in a new tab).
Let’s talk about your project.
Tell us about your property and the work you have in mind.
Explore this service